7th and C

May 8, 2017 § Leave a comment

framing completefuture home of the two story spiral stair

start of the waterproofing for the roof deck

Eagle Point

May 6, 2017 § Leave a comment

The guest house framing is topped out…nice view from the roof.

 

Eagle Point

April 21, 2017 § Leave a comment

Our crane left today

7th and C

April 21, 2017 § Leave a comment

Caught between the marsh and the ocean, the form rises

Eagle Point

April 14, 2017 § Leave a comment

We were lucky to be able to view the steel from 115 feet up.

9D574A36-0495-47D9-87C8-CB406B6AA8EC425D9370-D2F6-4671-862F-2DCEDAA23055IMG_2960IMG_5227IMG_5235

Eagle Point

April 8, 2017 § Leave a comment

With the concrete in place, the steel erection can begin.

IMG_2915

(the crane from afar)

IMG_4899

7th and C

April 8, 2017 § Leave a comment

The faceted facade was inspired by the long and short views, controlling sunlight throughout the day and a strict setback requirement.

Overall-house-shot

0316171623a1